Almost all of the apartments have been sold, and work on the façade and interior is progressing rapidly. Insulation is currently being installed on the exterior façade, gradually giving shape to the exterior appearance of Townhouse Rebe. Soon, it will be possible to see it in all its final glory.

Various work is also being carried out inside the building. The rough installation in the apartments is largely complete, as is the underfloor insulation and heating, which has already been installed in more than half of the apartments. At the same time, various pipes and installations are being laid, the screed is being applied, and the drywall is gradually being closed. Depending on weather conditions, the top coat of plaster is also being applied.
Translated with DeepL.com (free version)

The apartments are gradually taking shape—each one will have its own unique character thanks to our wide range of design options.